Refer to the exhibit. An engineer must send all traffic passing through interface fc1/1 on N9K_1 to the monitoring laptop using a SPAN session. This configuration has already been applied to Cisco UCS Manager.
Which additional set of actions must be taken to accomplish this goal?
Correct Answer: C Vote an answer
Refer to the exhibit.

Two Cisco Nexus Series Switches use EIGRP between their Eth1/1 interfaces. The switches are configured to support EIGRP authentication. Which set of CLI commands must be used to establish EIGRP neighborship?
Correct Answer: C Vote an answer
The network team needs permissions to access the Cisco UCS B-Series Servers via the Cisco UCS Manager GUI to configure the network and collect information about faults. The administrator wants to assign these permissions to the newly configured user called netops. Which set of tasks must the administrator perform to accomplish these goals?
Correct Answer: B Vote an answer
A network automation engineer must configure a Cisco NX-OS REST API on a Cisco 9000 Series Switch with these requirements:
* NX-API REST and the DME database must be enabled.
* The NX-API REST must listen for HTTP traffic on port 83.
* The HTTPS certificate must be uploaded.
Which configuration set must be used to accomplish these goals?
Correct Answer: C Vote an answer
An engineer must configure a new Cisco UCS B-Series infrastructure with a Cisco 5108 chassis. The configuration must meet these requirements:
* The setup must use aggregation between Cisco UCS Fabric Interconnects and IO modules.
* The implementation requires four 10 GbE connections per I/O module.
* The Cisco UCS Fabric Interconnects must support uplinks of different speeds for future expansion.
Which two steps must be taken to meet these requirements? (Choose two.)
Correct Answer: B,C Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A customer has a requirement to deploy a cloud service and needs to have full control over the underlying OS, data and application. Which cloud model meets this requirement?
Correct Answer: D Vote an answer

Refer to the exhibit. Which value must be added to the LDAP provider to complete the LDAP group map configuration in Cisco UCS Manager?
Correct Answer: D Vote an answer

Refer to the exhibit. In a bidirectional PIM network using Phantom RP as an RP redundancy mechanism, two Cisco NX-OS routers have these requirements:
*R1 must be the active RP.
*R2 must be the backup RP that is used only if R1 is not reachable
Drag and drop the configuration steps to complete the configuration for Router 2 Not all configuration steps are used.
Correct Answer:

Explanation:
An engineer uses Nexus API to get the output of the running configuration of a Cisco Nexus 9000 Series Switch. The engineer must create the request using JSON-RPC format. Which request code must be used to accomplish this goal?
Correct Answer: A Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
Which feature is supported with an In-Service Software Upgrade on a Cisco Nexus 9000 Series Switch?
Correct Answer: B Vote an answer