IBM 000-224 Actual Free Exam Questions & Community Discussion

  • Exam Code/Number: 000-224
  • Exam Name/Title: Power Systems with POWER7 Common Technical Sales Skills -v2
  • Certification Provider: IBM
  • Corresponding Certification: IBM Certified Sales Expert
  • Exam Questions: 85
  • Updated On: Jun 03, 2026
How many times can a standard request for Trial Capacity on Demand be performed for a Power 770?
Correct Answer: C Vote an answer
A customer is considering server consolidation and I/O virtualization in the DMZ environment. Servers on multiple VLAN5 will be consolidated onto a single physical server, and will need to communicate with multiple VLANs outside the sewer over a single shared Ethernet adapter in the VIO Sewer (VIOS).
Which of the following is a requirement?
Correct Answer: D Vote an answer
The POWER7+ processor offers Simultaneous Multithreading (SMT) which provides the processor the ability to transmit instructions from more than one hardware thread context.
What is the competitive multithreading offering from Oracle/Sun?
Correct Answer: C Vote an answer
Assuming that necessary requirements have been satisfied, which RAS feature can ensure that critical workloads can remain active in the event of a processor core failure?
Correct Answer: A Vote an answer
A customer plans to implement 3 production partitions on a Power 720, one each of AIX, IBM i, and Linux. The customer does not want to purchase an HMC, and will use IVM.
Which of the following is minimum PowerVM Edition required to manage the partitions?
Correct Answer: B Vote an answer
A customer needs to perform a disruptive server firmware upgrade, and plans to move partitions to another server. What benefit of virtualization is being utilized?
Correct Answer: B Vote an answer
What distinguishes the Power 760 from Power 770, Power 780 and Power 795 systems?
Correct Answer: C Vote an answer
When comparing Power Systems servers with HP Integrity servers, which of the following makes Power Systems a better choice?
Correct Answer: B Vote an answer
A system is being planned with three processor pools: the base pool, plus two user defined pools with limits to meet software licensing. All partitions will be uncapped.
Which of the following describes how processor cycles are assigned if one of the user pools does not use all the available cycles in a time slice?
Correct Answer: D Vote an answer
0
0
0
10