IBM C1000-031 Actual Free Exam Questions & Community Discussion
A customer has a 40 core Power System E980 and would like to use Mobile Capacity on Demand.
What is the minimum of static processor activations that are required?
What is the minimum of static processor activations that are required?
Correct Answer: D
Vote an answer
An AIX customer is purchasing two new POWER9 processor-based servers: each connected to its own DS8880 at different sites. The customer wants high availability with the least amount of downtime.
Which solution will satisfy the customer's requirements?
Which solution will satisfy the customer's requirements?
Correct Answer: B
Vote an answer
Which of the following statements is true regarding LPAR Mobility?
Correct Answer: A
Vote an answer
A customer is interested in running many Linux workloads and they are comparing a single Power System E950 versus multiple LC922 servers.
An advantage of the Power System E950 is the ability to support:
An advantage of the Power System E950 is the ability to support:
Correct Answer: C
Vote an answer
A customer has a mission-critical IBM i application running on a POWER9 processor-based server that requires eight processor licenses. For High Availability, a POWER9 CBU server is synchronized with the production server using PowerHA for IBM i.
What is the minimum number of IBM i processor licenses required on the CBU server?
What is the minimum number of IBM i processor licenses required on the CBU server?
Correct Answer: C
Vote an answer
A customer has ordered Capacity on Demand (CoD) for their server, and would like to implement it in their environment.
To use CoD, they download an activation code from the IBM:
To use CoD, they download an activation code from the IBM:
Correct Answer: B
Vote an answer
An AIX customer has a Power System E950 connected to a V9000 in one location. The customer is planning to purchase another Power System E950 and V9000 that will be installed 25 miles (40 km) from the primary location.
Which product would enable the applications to start at the secondary location, if any of the VMs failed at the primary location?
Which product would enable the applications to start at the secondary location, if any of the VMs failed at the primary location?
Correct Answer: A
Vote an answer
A customer with a Power System 770 and direct SAN I/O is planning a migration to a Power System E980.
The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
Correct Answer: C
Vote an answer
0
0
0
10
