IBM C4040-226 Actual Free Exam Questions & Community Discussion

  • Exam Code/Number: C4040-226
  • Exam Name/Title: Power Systems with POWER7 and IBM i Technical Sales Skills -v2
  • Certification Provider: IBM
  • Corresponding Certification: IBM Certified Sales Expert
  • Exam Questions: 74
  • Updated On: Jun 01, 2026
A customer would like a consolidated method to control system consoles, virtual storage, and partition resource settings for a POWER7+ system with 7 IBM i partitions and two VIO Server partitions. Which option supports this requirement?
Correct Answer: A Vote an answer
A customer with a POWER5 570 is replacing the system with a POWER7+ 750. In addition to a compatible IBM i version with the necessary Technology Refresh version, which other prerequisite must be accommodated?
Correct Answer: B Vote an answer
A customer needs to keep energy consumption as low as possible and is considering a POWER7+ server. In order to monitor and manage energy usage, which product is needed?
Correct Answer: D Vote an answer
An IBM i customer is already using IBM Backup, Recovery and Media Services for i (BRMS)and now wants to use BRMS to encrypt their backups.
What additional BRMS feature is needed?
Correct Answer: B Vote an answer
A customer currently performs all their backups to physical tape. The customer would like to improve the performance of their saves, but does not have the time to perform any major changes to their backup strategy or system design.
Which product will allow them to potentially decrease their backup times without significant modification to their system and existing save processes?
Correct Answer: C Vote an answer
A customer wants to build reports against data, stored in their Power Systems running IBM i and Query/400, using a browser-based user interface.
Which of the following products would support this requirement at the least cost?
Correct Answer: B Vote an answer
Which is a value of IBM Power Systems and IBM i when compared to a typical Windows, Unix or Linux solution stack?
Correct Answer: C Vote an answer
Which of the following is a method to increase fault tolerance and reduce potential outages from network equipment failures downstream from the IBM i environment?
Correct Answer: C Vote an answer
0
0
0
10