IBM C8060-218 Actual Free Exam Questions & Community Discussion
A company increased the number of CPUs allocated to IBM Sterling B2B Integrator (SBI). What should be done to take advantage of this increased processing capacity?
Correct Answer: B
Vote an answer
A developer is creating an IBM Sterling B2B Integrator (SBI) BusinessProcess (BP) using the Graphical Process Modeler (GPM). A Mailbox Delete service is being used to delete a
specific message from a mailbox. The developer is assigning the parameter MessageId to delete in the name-value pair in the Service Editor. There areother services being used in the BP that create the XML tag MessageId in Process Data. Which message mode in the GPM Service Editor will be required to ensure that the value of MessageId set in the Service Editor will be used?
specific message from a mailbox. The developer is assigning the parameter MessageId to delete in the name-value pair in the Service Editor. There areother services being used in the BP that create the XML tag MessageId in Process Data. Which message mode in the GPM Service Editor will be required to ensure that the value of MessageId set in the Service Editor will be used?
Correct Answer: C
Vote an answer
A client is experiencing failed Business Processes (BP) due to a resource group not having an active adapter available. Which menu path identifies the adapters that are disabled?
Correct Answer: C
Vote an answer
A developer has been tasked with configuring IBM Sterling B2B Integrator (SBI) to accept SFTP sessions from a partner SFTP client for the purposeA developer has been tasked withconfiguring IBM Sterling B2B Integrator (SBI) to accept SFTP sessions from a partner? SFTP client for the purpose of allowing the partner to pull invoice documents from their Mailbox. The SFTP session initiated by the partner will be authenticated by a keysignature to the SBI SFTP server. Which two keys are required to be configured in SBI for the establishment of the SFTP session? (Choose two.)
Correct Answer: D,E
Vote an answer
A system developer is involved in a project to onboard one trading partner. The trading partner is using EDIFACT. The system developer is required to setup a Business Process (BP) to process the EDIFACT documents arriving in a mailbox. Which out-of-the-box BP can be used for this purpose?
Correct Answer: B
Vote an answer
What is the most efficient way to terminate 1,000 instances of Business Processes (BP) from the dashboard interface?
Correct Answer: D
Vote an answer
The Clean-Up processes monitor available in the troubleshooter screen identifies all the system clean up processes along with status, work flow ID and last time each process was run. What are three of the required system processes that need to be run on a regular schedule? (Choose three.)
Correct Answer: C,D,E
Vote an answer
A customer has deployed a two node active-active IBMSterling B2B Integrator (SBI) cluster in the secure zone on two servers. The customer has installed two servers in the DMZ for the purpose of installing remote SBI Perimeter Servers to facilitate communications with external partners. External partners will connect to an external IP Load Balancer that will distribute inbound FTP/S, SFTP and HTTP Client sessions across the Perimeter Servers. The customer requirement is that if any single server fails, all the other SBI nodes and remote Perimeter Server instances must continue to activelyThe customer? requirement is that if any single server fails, all the other SBI nodes and remote Perimeter Server instances must continue to actively handle inbound sessions for each protocol. What is the minimum number of remote Perimeter Server instances that must be deployed in the DMZ?
Correct Answer: B
Vote an answer
0
0
0
10
