You are testing the functional correctness of an application which allows the driver of a car to control if the air that enters the passenger compartment is fresh or recycled. The car may be ordered in various configurations:
* Engine Size, can be: 1500cc, 1900cc, 2200cc, 2500cc
* Gearbox type, can be: automatic, manual 5-speed, manual 6-speed
* Cruise control, can be: yes or no
* Electric sunroof, can be: yes or no
It is expected that the most popular configuration will have a 1900cc engine and a manual 5-speed gearbox with cruise control and no electric sunroof. In order to achieve full BASE CHOICE coverage, how many configurations must be tested?
Correct Answer: D Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
You are assigned to an Agile team as a Test Analyst. In most ways, the team seems to be working well.
Iteration planning goes smoothly because the user stories are good quality. Most defects that are found by testing are fixed in the same iteration and those that do go live are not causing significant dissatisfaction amongst stakeholders. However, the team is unhappy because the Defect Removal Efficiency rate, measured for each iteration, is less than 80%.
What would be the MOST effective contribution by you as a TA, to improve the situation?
Correct Answer: D Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
In your role as a Test Analyst for the development of a business application, you asked the Product Owner to help you understand how the various product risks would affect the users.
Which product risk management activity was this?
Correct Answer: D Vote an answer
You are a TA in the development of a road traffic control application, which will be installed at busy road junctions, to control the operation of traffic signal lights according to sensors that detect traffic volume. This safety-critical project is still in the early stages of test planning and the project schedule is tight.
The Test Manager has asked you if crowd testing should be included in the project's test strategy. You do NOT think it should. Which limitation of crowd testing MOST influences your view?
Correct Answer: B Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
You have been appointed to be a TA in the development of a road traffic control application, which will be installed at busy road junctions to control the operation of traffic signal lights according to sensors that detect traffic volume on the various approaches to the junction. The project is still in the early stages of test planning, but it is already clear that despite a tight schedule its safety-critical nature demands careful and thorough testing.
You have been asked to decide whether automated test design would deliver benefits. Which characteristic of automated test design is MOST important for the development of this system?
Correct Answer: C Vote an answer