Microsoft 74-409 Actual Free Exam Questions & Community Discussion
A company has Windows Server 2012 R2 servers that have the Hyper-V role installed. The guest virtual machines are configured as follows:

You need to configure the environment to support the creation of failover clusters.
What should you do?

You need to configure the environment to support the creation of failover clusters.
What should you do?
Correct Answer: C
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A company has a network that contains one Active Directory Domain Services (AD DS) domain. The domain and forest functional levels are set to Windows Server 2008. All domain controllers run Windows Server 2012.
You need to enable the Active Directory Recycle Bin for the forest. What should you do?
You need to enable the Active Directory Recycle Bin for the forest. What should you do?
Correct Answer: A
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
You administer a Virtual Desktop Infrastructure (VDI). The environment runs on a Windows Server 2012 R2 server that has the Hyper-V role installed. You use Systems Center 2012 R2 Operations Manager to troubleshoot performance issues.
Some users of dedicated virtual desktops report slow response times within their sessions. Operations Manager reports indicate that a performance bottleneck exists at the storage layer.
You need to manage the amount of input/output operations per second (IOPS) that the dedicated desktop pool can generate.
What should you do?
Some users of dedicated virtual desktops report slow response times within their sessions. Operations Manager reports indicate that a performance bottleneck exists at the storage layer.
You need to manage the amount of input/output operations per second (IOPS) that the dedicated desktop pool can generate.
What should you do?
Correct Answer: D
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
You administer the Hyper-V environment for a large organization. The organization uses Windows Server 2012 R2 servers that have the Hyper-V role installed and System Center 2012 R2 Virtual Machine Manager (VMM). You create a virtual machine template that has the Operations Manager 2012 R2 agent pre-installed.
You receive the following Operations console alert for all domain controller VMs that use the VM template:
The script 'AD Replication Partner Op Master Consistency' Failed to create object. 'McActiveDir.ActiveDirectory'. This is an unexpected error.
The error returned was 'ActiveX component can't create object' (OxlAD)
The Active Directory Management Pack Objects (OOMADs) components are not installed on the Domain Controller. These components are required for the monitoring scripts to run successfully. See Alert Knowledge for additional details.
You need to correct the issue for the virtual machines that use the template.
What should you do?
You receive the following Operations console alert for all domain controller VMs that use the VM template:
The script 'AD Replication Partner Op Master Consistency' Failed to create object. 'McActiveDir.ActiveDirectory'. This is an unexpected error.
The error returned was 'ActiveX component can't create object' (OxlAD)
The Active Directory Management Pack Objects (OOMADs) components are not installed on the Domain Controller. These components are required for the monitoring scripts to run successfully. See Alert Knowledge for additional details.
You need to correct the issue for the virtual machines that use the template.
What should you do?
Correct Answer: B
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
You have three Windows Server 2012 R2 servers that are set up as a Hyper-V cluster. You use System Center 2012 R2 Virtual Machine Manager to manage the Hyper-V environment.
Users report that when a Hyper-V host server becomes overloaded, the performance of the virtual machines is unacceptable.
You need to analyze workloads and automatically migrate virtual machines from overloaded host servers to host clusters that have available capacity.
What should you configure?
Users report that when a Hyper-V host server becomes overloaded, the performance of the virtual machines is unacceptable.
You need to analyze workloads and automatically migrate virtual machines from overloaded host servers to host clusters that have available capacity.
What should you configure?
Correct Answer: B
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A company has Active Directory Domain Services (AD DS) domain controllers that run on Windows Server 2012 R2 servers. There are two forests, and each has a single domain. There is a two-way forest trust between the forests. The company uses Hyper-V for server virtualization. The Hyper-V environment contains the Hyper-V host servers as shown in the following table:

---
You prepare to deploy System Center 2012 R2 Data Protection Manager (DPM) to back up the Hyper-V environment. The deployment must meet the following requirements:
ensure that all Hyper-V servers can be backed up by using DPM Hyper-V hosts in the perimeter network must use certificate-based authentication Hyper-V hosts in the internal network must use Kerberos authentication minimize the total number of DPM servers
You need to deploy DPM to the environment.
What should you deploy?

---
You prepare to deploy System Center 2012 R2 Data Protection Manager (DPM) to back up the Hyper-V environment. The deployment must meet the following requirements:
ensure that all Hyper-V servers can be backed up by using DPM Hyper-V hosts in the perimeter network must use certificate-based authentication Hyper-V hosts in the internal network must use Kerberos authentication minimize the total number of DPM servers
You need to deploy DPM to the environment.
What should you deploy?
Correct Answer: A
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A company has Hyper-V host servers that run Windows Server 2012. The company also has virtual machines that run Windows Server 2008 R2 or Windows Server 2012.
You upgrade the Hyper-V host servers to Windows Server 2012 R2.
You need to ensure that all virtual machines can PXE boot by using a standard network adapter.
What should you do?
You upgrade the Hyper-V host servers to Windows Server 2012 R2.
You need to ensure that all virtual machines can PXE boot by using a standard network adapter.
What should you do?
Correct Answer: B
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A company has a highly-secure network infrastructure environment. All servers in the environment run Windows Server 2012 R2.
You must create a new virtual machine (VM) that meets the following requirements:
- The VM must minimize the risk that unauthorized firmware will run when the VM starts.
- The VM must load the operating system only if all operating system files have a valid signature.
You need to create the new VM. What should you do?
You must create a new virtual machine (VM) that meets the following requirements:
- The VM must minimize the risk that unauthorized firmware will run when the VM starts.
- The VM must load the operating system only if all operating system files have a valid signature.
You need to create the new VM. What should you do?
Correct Answer: C
Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
HOTSPOT
A company has a Windows Server 2012 R2 Hyper-V environment that includes two separate Active Directory Domain Services (AD DS) domains. The environment also has three servers named HOST1, HOST2, and HOST3 that have the Hyper-V role installed. HOST1 and HOST2 are configured as a failover cluster. The environment is configured as shown in the following diagram:

You plan to deploy two new virtual machines named VM-Server1 and VM-Server2. You have the following requirements:
Deploy both virtual machines as a failover cluster.
Utilize virtual hard disk (VHD) sharing for the cluster.
The virtual machines must survive a host server hardware failure.
You need to deploy the virtual machines.
Use the drop-down menus to complete each statement based on the information presented in the screenshot. Each correct selection is worth one point.
---

A company has a Windows Server 2012 R2 Hyper-V environment that includes two separate Active Directory Domain Services (AD DS) domains. The environment also has three servers named HOST1, HOST2, and HOST3 that have the Hyper-V role installed. HOST1 and HOST2 are configured as a failover cluster. The environment is configured as shown in the following diagram:

You plan to deploy two new virtual machines named VM-Server1 and VM-Server2. You have the following requirements:
Deploy both virtual machines as a failover cluster.
Utilize virtual hard disk (VHD) sharing for the cluster.
The virtual machines must survive a host server hardware failure.
You need to deploy the virtual machines.
Use the drop-down menus to complete each statement based on the information presented in the screenshot. Each correct selection is worth one point.
---

Correct Answer:

DRAG DROP
A software company has a Windows Server 2012 R2 server that has the Hyper-V role installed. The server hosts a single virtual machine (VM) named VM1. VM1 has one virtual CPU, one virtual hard disk, and one virtual network interface card (NIC) that is attached to an external network.
The company prepares to test its software in VM1. Before testing begins, VM1 must meet the following requirements:
--
Availability of network bandwidth must be maximized. VM network connectivity must be fault tolerant.
You need to configure the environment.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

A software company has a Windows Server 2012 R2 server that has the Hyper-V role installed. The server hosts a single virtual machine (VM) named VM1. VM1 has one virtual CPU, one virtual hard disk, and one virtual network interface card (NIC) that is attached to an external network.
The company prepares to test its software in VM1. Before testing begins, VM1 must meet the following requirements:
--
Availability of network bandwidth must be maximized. VM network connectivity must be fault tolerant.
You need to configure the environment.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

0
0
0
10
