NABCEP PVIP Actual Free Exam Questions & Community Discussion
An 8KWsc roof-mounted array is placed on a school building. The inverter is located within 1 ft, of the array boundary and has an integrated ac-and dc-disconnecting switch. The system is to be connected to a 400A load center, protected by a 400A main breaker. Which of the following MUST be included to meet NEC requirements?
Correct Answer: D
Vote an answer
A PV array's tilt is 30° at a latitude of 40°N. What is the winter energy loss compared to optimal tilt?
Correct Answer: C
Vote an answer
An installer troubleshooting a ground-mounted array finds It to be performing as expected most of the time, but a ground-fault error is indicated on hot days. The inverter is in a shaded location. Which of the following should the installer check for FIRST when troubleshooting this array?
Correct Answer: A
Vote an answer
A PV array with 58 in. X 38 in modules in portrait orientation is to be mounted at a 35 tiit angle on a shingle roof that has a 5:12 pitch. Assuming the support leg is attached to the top of the modules and is perpendicular to its face, what is the length of the support leg for the modules?


Correct Answer: C
Vote an answer
When installing an ungrounded PV system with an open-circuit voltage of 450Vdc and a maximum voltage of
3000Vdc which procedures should be followed to establish an electrically safe condition?
3000Vdc which procedures should be followed to establish an electrically safe condition?
Correct Answer: B
Vote an answer
A PV connection is being made at the center of a 300 ft. long 200 feeder. See the attack diagram. The feeder originates in the upper third of the 800A main service panel (800A main breaker) with a 200A breaker and terminates in a 200A main-lug-only subpanel. The rated output of the PV system inverter is 100A.

Which are the NIMUMUM actions required to achieve an NEC-compliant installation?

Which are the NIMUMUM actions required to achieve an NEC-compliant installation?
Correct Answer: B
Vote an answer
A rooftop PV system is proposed for a commercial building with a membrane roof. The structural engineer specifies a maximum allowable dead load of 5 psf. The PV modules weigh 3 psf, and the racking adds 1.5 psf.
What additional load can be added without exceeding the limit?
What additional load can be added without exceeding the limit?
Correct Answer: C
Vote an answer
Most electric service providers require interactive PV equipment to comply with which for interconnection to their distribution grid?
Correct Answer: A
Vote an answer
0
0
0
10