A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located
200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?
Correct Answer: D Vote an answer
A rooftop PV system is being installed on a residential building with a 30-degree tilt angle. The modules are oriented directly south in a location where the solar noon altitude on December 21st is 30 degrees. What is the minimum distance required between two rows of modules to avoid shading between 9 AM and 3 PM solar time, assuming the module height is 3 feet?
Correct Answer: B Vote an answer
According to the NEC, if the PV system disconnect and the building service disconnect are at different locations, there MUST be a/an:
Correct Answer: D Vote an answer
Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?
Correct Answer: A Vote an answer
A PV system combiner box contains six source circuits, each with an Isc of 8A. The output conductor is 6 AWG THWN-2 copper rated at 90°C. What is the maximum allowable OCPD rating per NEC?
Correct Answer: A Vote an answer
The AHJ for enforcement of the NEC has which responsibility?
Correct Answer: D Vote an answer
A PV array is installed with a rapid shutdown system per NEC 690.12. The array is 15 feet from the service entrance. What is the maximum voltage allowed within the array boundary 30 seconds after shutdown initiation?
Correct Answer: A Vote an answer
Which of the following MUST be referenced for determining a site's design wind speed?
Correct Answer: B Vote an answer