Subsequent to the preparation of construction documents, prior to permitting, the enactment of codes or laws requires changes to the project.
Which of the following should occur?
Correct Answer: A Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
Evaluation and mitigation of indoor air quality in an existing facility assessment would include participation by which of the following? Check the three that apply.
Correct Answer: A,D,F Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
What is the best method for an architect to reduce liability related to unknown site conditions?
Correct Answer: B Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
The main goals on a large project are ease of communication and commitment from the project team.
Which scheduling technique should be used?
Correct Answer: C Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
Construction of a gymnasium is scheduled to be complete 365 days from the date of the notice to proceed. On Friday, day 355 of the schedule, the contractor submits a punch list to the architect for substantial completion.
The architect agrees to review the punch list on-site after the weekend.
On Monday, the architect discovers that a subcontractor left open a skylight over the weekend, allowing heavy rain to fall into the courtyard area and damage the gymnasium floor. It was determined the flooring must be replaced. The lead time for new flooring is 8-10 weeks, and installation will take 14 days. The architect's agreement with the owner is contracted to end 30 days after substantial completion.
Which of the following documents must the architect prepare immediately? Check the two that apply.
Correct Answer: B,C Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
A key Project Manager leaves an architectural firm halfway through a project. Several days of lost productivity pass while the new Project Manager determines the customized organization that the previous Project Manager used. The new Project Manager recommends implementing new office policies to create standards and quality control methods for the entire office.
Which methods should be implemented? Check the four that apply.
Correct Answer: B,D,E,F Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
Which of the following is a primary responsibility of the architect during construction observation?
Correct Answer: C Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
What type of contract involves payment based on actual costs plus a fee?
Correct Answer: A Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).