You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
What do you have to consider in this scenario?
Correct Answer: A
Vote an answer
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
Correct Answer: A,B,D
Vote an answer
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
On which of the following objects can you collect these costs? (Choose two)
Correct Answer: B,D
Vote an answer
Where can you define the default storage location for the material component of a production order? (Choose three)
Correct Answer: C,D,E
Vote an answer
In which of the following objects can you activate backflushing for production orders? (Choose three)
Correct Answer: B,D,E
Vote an answer
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
Correct Answer: A
Vote an answer
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
Which BOM item category must you set to fulfill this requirement?
Correct Answer: D
Vote an answer