In what sequence are the steps of material requirements planning performed in SAP ECC?
Correct Answer: B
Vote an answer
For which of the following objects can you enter a confirmation?(Choose two)
Correct Answer: C,D
Vote an answer
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
Correct Answer: A
Vote an answer
Which of the following scheduling types can only be used in capacity planning?
Correct Answer: A
Vote an answer
Which of the following features are offered by MRP areas in SAP ECC?(Choose two)
Correct Answer: C,D
Vote an answer
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define?(Choose two)
What does a firming type define?(Choose two)
Correct Answer: B,D
Vote an answer
Which of the following are characteristics of ECC master production scheduling (MPS)?(Choose three)
Correct Answer: A,C,E
Vote an answer
What do you have to consider regarding consumption?(Choose two)
Correct Answer: A,D
Vote an answer