Permanent trench breakers cannot be installed within a ______________
Correct Answer: D
Vote an answer
What is the typical distance between new and existing pipe?
-1 to 18 in
-12 to 18 in
-12 to 24 in
49 CFR 192.325 and 192.250
-1 to 18 in
-12 to 18 in
-12 to 24 in
49 CFR 192.325 and 192.250
Correct Answer: B
Vote an answer
In the CGA Best Practice, an icon of a green square identifies
-On call center
-Facility Owner
-Designer
-Excavator
-On call center
-Facility Owner
-Designer
-Excavator
Correct Answer: B
Vote an answer
If an underground pit is vented, there must be a means of preventing __________ from reaching the vault atmosphere.
Standard?
Standard?
Correct Answer: A
Vote an answer
Verifying that _________ activities are properly monitored and do not result in the ___________ of sand, silt, and/or sediment into sensitive environmental resource areas,
Correct Answer: B
Vote an answer
The company installing a utility will ID areas within _______ ft of existing facilities where blasting will take place
Correct Answer: A
Vote an answer
Sub-part G 192.309 specifies which dents on pipe must be repaired if the steel pipe is to be operated at pressure that produces a hoop stress of 20 percent or more of SMYS
-Dents more than _____ inches of pipe diameter in pipe over 12 3/4 inches in diameter
-Dents more than ______ inches of pipe pipe diameter in pipe less than 12 3/4 inches in diameter
-Dents more than _____ inches of pipe diameter in pipe over 12 3/4 inches in diameter
-Dents more than ______ inches of pipe pipe diameter in pipe less than 12 3/4 inches in diameter
Correct Answer: A
Vote an answer