A customer is planning to install and configure a Commercial Off the Shelf (COTS) server IBM X3550 as a Signaling Server for their Communication Server (CS) 1000 Rls.. 7x network.
Which two statements describe the software installation process? (Choose two)
Which two statements describe the software installation process? (Choose two)
Correct Answer: A,D
Vote an answer
A customer is installing a new common processor Media Gateway (CPMG) in a Communication Server (CS) 1000E system. They are connected to the backplane serial port 0 of the MGC to access the configuration menu. No IP information exists for the MGC.
How does the customer access the configuration menu for the MGC?
How does the customer access the configuration menu for the MGC?
Correct Answer: D
Vote an answer
A customer is adding a new Avaya Communication Server (CS) 1000E Rls. 7x server within their existing release 7x network. The CPMG based server will become member server within an existing CS 1000 Rls. 7.0x security domain.
Which statement describes the process you should use to simultaneously install Linux Base and deploy application to the CPMG Co-Resident server?
Which statement describes the process you should use to simultaneously install Linux Base and deploy application to the CPMG Co-Resident server?
Correct Answer: C
Vote an answer
A customer has deployed a Communications Server 1000Rls. 7x system at their site. Their sales department is expanding and has asked that five new telephones be added with the same capabilities as the existing telephones in the department.
Which programming command should be used to complete this task?
Which programming command should be used to complete this task?
Correct Answer: A
Vote an answer
A customer with an existing Option 11C Rls. 5.5 chassis system plans to upgrade to a Communication Server (CS) 1000E Rls. 7x Standard Availability with a single IP Media Gateway (MG) 1000E chassis.
To complete the upgrade, which component in the Option 11C must be replaced?
To complete the upgrade, which component in the Option 11C must be replaced?
Correct Answer: A
Vote an answer
Click the Exhibit button.

A technician is asked to review the existing route information for the customer.
According to the printout shown in the exhibit, type of route is this?

A technician is asked to review the existing route information for the customer.
According to the printout shown in the exhibit, type of route is this?
Correct Answer: C
Vote an answer
Your customer has requested you add the Call Park Feature to their Communication Server 1000 Release 7x system. You have been asked to assign at least eight consecutive numbers that can be used to park calls.
Which CLI overlay and command will provide you with numbers that are unassigned and available?
Which CLI overlay and command will provide you with numbers that are unassigned and available?
Correct Answer: A