ISQI CTFL-PT_D Actual Free Exam Questions & Community Discussion

  • Exam Code/Number: CTFL-PT_D
  • Exam Name/Title: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
  • Certification Provider: ISQI
  • Corresponding Certification: Performance Testing
  • Exam Questions: 42
  • Updated On: Jul 24, 2026
Identify the correspondences between the aspects (listed from 1 to 4) and factors to be considered (listed from A to D) when selecting performance testing tools.
1. Compatibility.
2. Scalability.
3. Understandability.
4. Monitoring.
1. Level of technical knowledge needed to use the tool.
2. Correlation of the monitoring with the defined transactions.
3. Protocols.
4. Ability to generate load from multiple points of presence.
SELECT ONE OPTION
Correct Answer: A Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.
Question
What could be the reason why it is not possible to play back the script?
SELECT ONE OPTION
Correct Answer: C Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
In which activity of the testing process are specific test conditions identified for performance testing?
SELECT ONE OPTION
Correct Answer: B Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.
k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
* The project follows a sequential development life cycle model.
Question
Which is the right moment in the project to analyze and evaluate the performance risks?
SELECT ONE OPTION
Correct Answer: A Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
Correct Answer: D Vote an answer
Explanation: Only visible for EduDump members. You can sign-up / login (it's free).
0
0
0
10