You have created one performance measure, PM1, which has the following definition with calculation sequence 1.

You want to refer PMl output in performance measure 2 having calculation sequence 2. Which two statements are true?

You want to refer PMl output in performance measure 2 having calculation sequence 2. Which two statements are true?
Correct Answer: A,D
Vote an answer
By using which method can a new participant be created In the Incentive Compensation application?
Correct Answer: D
Vote an answer
A compensation analyst wants to pay commissions calculated for period 4 that were initially missed. The current date falls into period 8, and the last paid payment batch was in period 7.
Identify two options available for the compensation analyst to pay for period 4 commissions.
Identify two options available for the compensation analyst to pay for period 4 commissions.
Correct Answer: B,E
Vote an answer
The 'Run Crediting and Rollup' process request completes successfully but no credits are created. Which three configurations must be verified?
Correct Answer: A,B,D
Vote an answer
Your client is tuning four performance measures with the same output expression 'SUM (Credit.Credit Amount)' and no scorecard. The following transactions were processed through the performance measure.

On examining closely, you found that though performance measure has the same output expression, the output (refer below) for the performance measure is not equal.

Which performance measure attribute is responsible for this variation?

On examining closely, you found that though performance measure has the same output expression, the output (refer below) for the performance measure is not equal.

Which performance measure attribute is responsible for this variation?
Correct Answer: C
Vote an answer
Which asset typo must you select for searching web service in Oracle Enterprise Repository?


Correct Answer: C
Vote an answer
You want to move configuration from Development Instance to Production Instance. Which three entities can be moved by using out of the box XML download and upload functionality?
Correct Answer: C,F,G
Vote an answer
A payment plan is to be configured to pay a minimum (draw) flat amount of 8,000 per period, which is nonrecoverable. Payment adjustments must be applied only to commission type earnings, and bonus earnings should not be adjusted by the payment plan.
How should you configure the payment plan?
How should you configure the payment plan?
Correct Answer: D