What is the maximum number of CPU cores that can be configured in a Dell EMC PowerEdge R6525 server?
Correct Answer: C Vote an answer
Which three steps must a technician take prior to replacing a server component with blue tabs/release?(Choose three.)
Correct Answer: A,C,E Vote an answer
A system engineer tried to remotely update the firmware of the PSUs on a PowerEdge 15G server, but the update failed.
An error message is received:
- PSU0006: Power supply X is incorrectly configured
What is the reason for the failure?
Correct Answer: B Vote an answer
A technician is configuring the server to boot to the Internal Dual SD Module.
Which BIOS boot option should the technician select?
Correct Answer: D Vote an answer
What is the drive characteristic of a BOSS M.2 drive in a Dell EMC PowerEdge server?
Correct Answer: A Vote an answer
A technician receives a repurposed PowerEdge server. After racking and cabling the server, they attempt to log into the iDRAC but cannot do so. The default login account has been disabled.
What method can be used to enable the default login account?
Correct Answer: D Vote an answer
A technician needs to use the Lifecycle Controller to update the server usingftp.dell.com.
Which step must the technician take to complete this task?
Correct Answer: B Vote an answer
Case Study 4
A company is experiencing a noticeable decrease in performance when accessing data purpose file shares. In addition, a file pool policy moves data that has not been modified for the slow data access.
The number of users accessing the cluster has not changed. The administrator has shared the following baseline metrics. The outputs were captured from a performance-acceptable time frame.
Trace route shows:
- 3 hops between clients and the cluster
- Average latency is 3 ms
Iperf shows:
- 940 Mb/s average bandwidth
- 005 ms average jitter
Netstat on the local network shows:
- 05% average re-transmission rate
Hostcache list:
- 20 ms average roundtrip time across all clients
The administrator shows you the following output from the netstat command:
- 32366653 data packets (35556615947 bytes)
- 8010 data packets (9525723 bytes) re-transmitted
Based on the output, what information should be provided to the administrator?
Correct Answer: B Vote an answer
In addition to hashing, what algorithms are used by TPM?
Correct Answer: C Vote an answer
A systems engineer needs to configure a RAID volume that combines disk striping across multiple disks with parity for data redundancy. Parity information is stored once and on each disk.
What RAID level does the engineer need to configure?
Correct Answer: A Vote an answer
A technician wants to upgrade the iDRAC license from Express to Enterprise.
What are the three methods the technician can use to install the new license?(Choose three.)
Correct Answer: A,D,E Vote an answer
A technician wants to install a new version of OMSA onto a server that already has an existing version of OMSA.
What is required for this new installation?
Correct Answer: C Vote an answer
SIMULATION
A customer wants to change the PSU configuration to a 2+0 with PSU2 as the primary. Use the simulator to complete this task in the iDRAC UI.
Correct Answer:
Answer in Explanation
Explanation:
To change the Power Supply Unit (PSU) configuration to a 2+0 setup with PSU2 as the primary in theiDRAC interface, follow these steps:
Step-by-Step Guide:
Navigate to Power Management Settings:
In the iDRAC interface, go to the Configuration tab at the top. Select Power Management from the dropdown options.
Locate the Power Configuration Section:
Within the Power Management settings, look for a section labeled Power Configuration or Power Supply Configuration.
Select the Redundancy Policy:
Change the Redundancy Policy to 2+0. In this configuration, there will be no redundancy, and both power supplies will be active but configured as independent power sources without failover. Set PSU2 as the Primary PSU:
Locate the option to designate the Primary PSU. Select PSU2 as the primary power source. This setting ensures that PSU2 will handle the primary power load under normal conditions.
Apply and Save Changes:
Once you have made these changes, click Apply or Save to confirm the new configuration.
The interface may prompt for confirmation, after which the settings will be saved, and PSU2 will become the primary power supply under a 2+0 configuration.
Verify Configuration:
Review the updated settings to confirm that PSU2 is now set as primary and that the redundancy policy is 2+0, meaning only PSU2 is actively providing power without a secondary backup.
By following these steps in the iDRAC simulator, you will set up PSU2 as the primary power source with no redundancy, ensuring a 2+0 configuration. This setup will leverage PSU2 exclusively without automatic failover to another power supply.
A technician needs to repurpose a server. The server has dual processors with 18 cores each. The OS only sees 24 threads in total.
Which setting should the technician change in Processor Settings in the System BIOS?
Correct Answer: B Vote an answer